Gas Infrastructure
We are experts in all aspects of gas infrastructure development and maintenance, and our ability to handle large-scale tasks led to OnGas commissioning our team to supply and install the entire reticulation network to Canterbury's Pegasus Township development. From planning and consent applications to installation and testing, LPG installation and management, as well as heavy civil construction where sheet piling and dewatering solutions are required, our Gas Infrastructure experts have extensive expertise and hands on experience.
Our capability includes:
- LPG installations (bulk and liquid)
- Gas reticulation networks
- Services connections
- Project management and design
- Consent applications
- Pipeline testing
- Cleaning and flushing
- Heavy civil construction (sheet piling and dewatering)
- Turnkey solutions
Some of our previous projects include:
OnGas Ltd - Pegasus Township Gas Reticulation Scheme
We have a long established relationship with OnGas including all the servicing of their reticulated gas network in the South Island. As part of this relationship, we were commissioned to supply and install the reticulation network within the Pegasus Township development.
This comprised over 50km of PE pipework ranging in size from 25mm to 200mm and street connections to approximately 1800 homes and commercial properties. We were also responsible for the installation of the 100 tonne LPG storage facility, above ground pipework, a boiler system and finally the successful commissioning of the entire project.
We continue to work within the township connecting each new home and business.
Rockgas Ltd - Wigram Skies Gas Reticulation Stages 1A to C
The Wigram Skies Development is a lifestyle subdivision being developed by Ngai Tahu on the old Wigram Aerodrome site. When complete, it will provide a mixture of low, medium and high density housing, a commercial hub and many recreational and leisure features.
We were commissioned by to supply and install a total of 4.5 kilometres of 63, 110 and 160mm gas mains into the first available stages comprising of 153 sections.